HOW TO DEPLOY PRE-CONNECTED 2 ½” HOSE LINE
- Take position
- At tailboard
- Captain’s side
- Access hose load
- Remove protective cover if necessary
- Grasp webbing loop
- Webbing with right hand
- Pull shouldered load
- Onto shoulder
- Clear remaining hose load from bed
- Grasp pull loop
- Pull remaining hose
- Advance towards objective
- Until slack is gone
- Loosen webbing loop
- Remove from shouldered load
- Continue to advance hose
- Allow hose to pay off top
- Manage hose
- To arrive at objective